Langkau ke kandungan utama

Pembangunan Tanah Strategik

Selain di sepanjang landasan kereta api, RAC turut memajukan tanah di lokasi berpotensi tinggi di seluruh negara melalui projek yang memberi manfaat kepada masyarakat.

Pembangunan ini sama ada untuk perumahan, kegunaan komersial atau kemudahan awam membawa faedah jangka panjang kepada rakyat Malaysia dengan mengoptimumkan aset tanah negara secara bertanggungjawab.

Setiap projek mencerminkan keyakinan kami bahawa tanah milik kereta api, termasuk yang terletak di luar kawasan stesen, tetap berpotensi menjana nilai sosial, ekonomi dan alam sekitar untuk negara.

 

  • Stesen Keretapi Kuala Lumpur
    Icon
    Project Cost
    RM7.87 million
    Icon
    Expected Completion Date
    24 March 2026
    Purpose
    Upgrading Works on the Main Facade
    Repair Components
    Icon
    Restoration and repainting of main facade walls
    Icon
    Replace existing window panels
    Icon
    Restoration and repair of underground pedestrian tunnel
    Icon
    Restoration of Chatri (traditional small roof tower structure)
  • Stesen Keretapi Ipoh
    Icon
    Project Cost
    RM650,000
    Icon
    Expected Completion Date
    21 May 2025
    Purpose
    Upgrading and Construction of a New Arrival Hall for Train Passengers
    Repair Components
    Icon
    Upgrading of the new arrival hall
    Icon
    Mechanical and electrical works (CCTV, air-conditioning, ACG gate, and wiring)
    Icon
    Repair of toilet fittings
    Icon
    Repainting of the building, including the existing train station waiting area
  • Stesen Keretapi Seremban
    Icon
    Project Cost
    RM8.3 million
    Icon
    Expected Completion Date
    11 December 2025
    Purpose
    Preserving the Heritage of Malaysia's Railway Stations Repair
    Repair Components
    Icon
    Repair and conservation works for the main station building
    Icon
    Construction works to house the generator set (genset) and VRV (mechanical system)
    Icon
    Repair of toilet fittings
    Icon
    Construction of a new drainage system
  • Malayan Railway Building (MRB), Godowns and Georgetown Dispensary, Penang
    Icon
    Project Cost
    RM20 - RM25 million
    Icon
    Expected Completion Date
    2028
    (pioneer works have Completion Year been implemented)
    Purpose
    Conservation of the Malayan Railway (MRB) Building and other Heritage Buildings at Gat Lebuh China (Godowns and Georgetown Dispensary)
    Icon
    Preserve railway heritage assets located within the UNESCO World Heritage Zone
    Icon
    Enhance the surrounding area for the benefit of the local community